Product Detail :
|
1. Removal & Cleaning of Existing Steel Damaged Portion, 1. Necessary Preparation for Fabrication to Be Done.
1.required Material (Rods, Plates, Sheets, Electrodes, Gas Etc.,) to Be Brought By Contractors, 1. Hose Test to Be Shown to Prove the Integrity of Welding.
|